MAC International Revolution Electric 10/150 repair times and service schedule
MAC International Revolution Electric 10/150: 150 bar · 10 l/min · hot water, electric static / wall mounted pressure washer. Below are the recommended service intervals and guide labour times. The annual service takes about 2 h 30 min.
Electrically heated (no burner): burner operations do not apply. 18-24 kW heating, 32 A or 45 A supply. Also available in stainless steel (S.S.) cabinet.
Specifications
TypeHot water, electric
FormatStatic / wall mounted
Pressure150 bar
Flow rate10 L/min (600 L/h)
Connected load3 kW
HeatingElectric heating
Supply400 V 3~
Max temperature80 °C
Heating output24 kW
StatusCurrent model
Model codeREVOLUTION-ELECTRIC-10-150
Service schedule and repair times
Every 6 months
| Operation | Guide time | Hours |
|---|
| Heating Coil De-scale | 1 h | 1 h |
| 6-Month Intermediate Service | 1 h 30 min | 1.5 h |
Every 12 months
| Operation | Guide time | Hours |
|---|
| Anti-scale Dosing System Service | 20 min | 0.33 h |
| Annual Full Service | 2 h 30 min | 2.5 h |
| Hose Reel Service / Replacement | 45 min | 0.75 h |
| Pipework and Wash Point Inspection | 1 h | 1 h |
| Annual Service — Static Hot Water | 3 h | 3 h |
Every 24 months
| Operation | Guide time | Hours |
|---|
| 2-Year Major Overhaul | 4 h | 4 h |
| 2-Year Major Overhaul — Static | 5 h | 5 h |
Repairs (as required)
| Operation | Guide time | Hours |
|---|
| High-Pressure Hose Replacement | Members | |
| Pressure Switch Replacement | Members | |
| Unloader Valve Replacement | Members | |
| Flow Switch Replacement | Members | |
| Thermostat Replacement | Members | |
| Check Valve Replacement (set) | Members | |
| Diagnostic — Fault Finding | Members | |
| Pump Seal Kit Replacement | Members | |
| Control Board / PCB Replacement | Members | |
| Pump Rebuild (full) | Members | |
| Heating Coil Replacement | Members | |
| Break Tank Float Valve Replacement | Members | |
Guide times are for a competent technician with the correct parts and tools, and exclude travel. Always follow the manufacturer's service documentation. Specifications: manufacturer data.
See every repair time for the MAC International Revolution Electric 10/150
PressureBook members get the full repair-time schedule, allocated times, parts lists and one-click quotes that fill in labour from these times. Try it free for 14 days, no card needed.
Start free trialOther MAC International machines