Home › Repair times › MAC International › Plantmaster 12/100

MAC International Plantmaster 12/100 repair times and service schedule

MAC International Plantmaster 12/100: 100 bar · 12 l/min · hot water, electric static / wall mounted pressure washer. Below are the recommended service intervals and guide labour times. The annual service takes about 2 h 30 min.

Also available in stainless steel (S.S.) cabinet.

Specifications

TypeHot water, electric
FormatStatic / wall mounted
Pressure100 bar
Flow rate12 L/min (720 L/h)
Connected load2.2 kW
HeatingOil / diesel burner
Supply230 V
Max temperature100 °C
StatusCurrent model
Model codePLANTMASTER-12-100

Service schedule and repair times

Every 6 months

OperationGuide timeHours
Burner Fuel Filter Replacement10 min0.17 h
Burner Fuel Nozzle Replacement20 min0.33 h
Heating Coil De-scale1 h1 h
6-Month Intermediate Service1 h 30 min1.5 h

Every 12 months

OperationGuide timeHours
Burner Electrode Replacement (pair)20 min0.33 h
Anti-scale Dosing System Service20 min0.33 h
Combustion Analysis30 min0.5 h
Annual Full Service2 h 30 min2.5 h
Hose Reel Service / Replacement45 min0.75 h
Pipework and Wash Point Inspection1 h1 h
Annual Service — Static Hot Water3 h3 h

Every 24 months

OperationGuide timeHours
Photocell / Flame Sensor Replacement15 min0.25 h
2-Year Major Overhaul4 h4 h
2-Year Major Overhaul — Static5 h5 h

Repairs (as required)

OperationGuide timeHours
High-Pressure Hose ReplacementMembers
Pressure Switch ReplacementMembers
Unloader Valve ReplacementMembers
Ignition Transformer ReplacementMembers
Fuel Pump Replacement (burner)Members
Flow Switch ReplacementMembers
Thermostat ReplacementMembers
Check Valve Replacement (set)Members
Diagnostic — Fault FindingMembers
Pump Seal Kit ReplacementMembers
Control Board / PCB ReplacementMembers
Burner Motor ReplacementMembers
Pump Rebuild (full)Members
Heating Coil ReplacementMembers
Break Tank Float Valve ReplacementMembers

Guide times are for a competent technician with the correct parts and tools, and exclude travel. Always follow the manufacturer's service documentation. Specifications: manufacturer data.

See every repair time for the MAC International Plantmaster 12/100

PressureBook members get the full repair-time schedule, allocated times, parts lists and one-click quotes that fill in labour from these times. Try it free for 14 days, no card needed.

Start free trial

Other MAC International machines

MAC International Avant 12/100100 bar · 12 L/min · Hot water, electricMAC International Avant 15/200200 bar · 15 L/min · Hot water, electricMAC International Avant 21/200200 bar · 21 L/min · Hot water, electricMAC International Drop Revolution 11/120120 bar · 11 L/min · Hot water, electricMAC International Lux 12/100100 bar · 12 L/min · Hot water, electricMAC International Plantmaster 15/200200 bar · 15 L/min · Hot water, electricMAC International Plantmaster 21/200200 bar · 21 L/min · Hot water, electricMAC International Plantmaster Electric 10/150150 bar · 10 L/min · Hot water, electric